Saturday, July 10, 2010

Aylmer, Ontario


Red Ball #82 east bound overtakes Mixed #356 at Aylmer.
 
The first station being built on the layout coming out of the westend staging is Aylmer, Ontario. This little town hosts the coaling plant that was used up until the line was dieselized in 1951.
All the track is handlaid. And all the turnouts are built using the FastTracks system. All the turnouts are controlled using Fast Tracks newest product, The Bullfrog. The train shown is the first trains run on the layout on July 29, 2009 after an excellent work session with some of my buddies.